Roofing · 01 / 06

Residential
Roofing.

Architectural shingles, premium asphalt, metal, and synthetic slate. Full tear-off when the deck requires it.

What We Use

Five Materials.
Honest Picks.

No upsells. We recommend the material that fits the deck, the pitch, the climate, and the budget — not the one with the best margin.

MAT · 01

Architectural Shingles.

Multi-layer asphalt shingles built to resist wind uplift and shed water cleanly. The default residential pick in Western PA for good reason — long warranty, good fire rating, and they handle the freeze-thaw cycle.

LIFESPAN25–30 yrs
PROFILEMulti-layer asphalt
SUITED FORMost pitched roofs
MAT · 02

Premium Asphalt.

Three-tab and luxury asphalt shingles for projects where the architectural profile or the price point calls for it. We carry both ends of the asphalt spectrum and explain the trade-offs honestly.

LIFESPAN20–50 yrs
PROFILE3-tab or luxury
SUITED FORBudget or premium feel
MAT · 03

Metal Roofing.

Standing-seam panels, ribbed metal, or metal shingles. Sheds snow, lasts decades, and the energy profile beats asphalt. We install over solid decking with appropriate underlayment and clip systems.

LIFESPAN40–70 yrs
PROFILEStanding-seam or panels
SUITED FORLong-haul / snow-shedding
MAT · 04

Synthetic Slate.

Polymer-composite shingles that read as slate at a fraction of the weight and cost. The right choice when the look matters but the deck can't carry real slate. Excellent impact rating.

LIFESPAN40–50 yrs
PROFILEPolymer composite
SUITED FORSlate look, lighter load
MAT · 05

Full Tear-Off.

When the deck is questionable or the existing roof has had two or three overlays, we tear off to bare deck, inspect the sheathing, replace what's gone, and start clean. It costs more up front and saves the warranty later.

WHENDeck inspection failure
INCLUDESSheathing replacement
DURATIONAdd 1–2 days
Process

Four Steps
From Call To Complete.

Same crew estimates, schedules, and installs. Insurance coordinated when applicable.

01
Inspect

On-site inspection.

Roof, deck, flashing. Photos taken. No surprises later.

02
Estimate

Itemized estimate.

Materials, labor, timeline. Financing laid out if you want it.

03
Schedule

Set the start date.

Insurance coordinated when applicable. Permits handled.

04
Install

Crew on-site.

Daily progress, daily cleanup. Final walk-through.

Dollar Bank
Financing

Replace Your Roof
With Zero Down.

Promo code 0008-4798 · Apply online with Dollar Bank.

Ready When You Are

Request An Estimate.